PROJECT DETAIL Sayembara Kampung Sindangbarang Development, Desa Pasir Eurih as Cultural and Tourism Village

Sayembara Kampung Sindangbarang Development, Desa Pasir Eurih as Cultural and Tourism Village

PROJECT DETAIL Engineering Services for Civil, Structural and Building Works of Jawa 2 Combined Cycle Power Plant Project for Mitsubshi Hitachi Power System

Engineering Services for Civil, Structural and Building Works of Jawa 2 Combined Cycle Power Plant Project for Mitsubshi Hitachi Power System

PROJECT DETAIL Detailed Feasibility Design of Waste To Energy Project, Bantargebang

Detailed Feasibility Design of Waste To Energy Project, Bantargebang

PROJECT DETAIL AMDAL Study and Approval Process of Adaro Envirocoal Upgrade Production to 80 MTPA

AMDAL Study and Approval Process of Adaro Envirocoal Upgrade Production to 80 MTPA

PROJECT DETAIL Visionary Master Plan Labuan Port Malaysia

Visionary Master Plan Labuan Port Malaysia

PROJECT DETAIL Detail Master Plan of Mandalika Tourism Area at Lombok (2014-2015)

Detail Master Plan of Mandalika Tourism Area at Lombok (2014-2015)

PROJECT DETAIL Master Plan Study Telaga Batu Arang

Master Plan Study Telaga Batu Arang

PROJECT DETAIL Environmental Baseline Assessment (EBA) of Total E&P South East Birds Head (SWBH) - West Papua

Environmental Baseline Assessment (EBA) of Total E&P South East Birds Head (SWBH) - West Papua

PROJECT DETAIL Site Integrity and Master Plan MM2100 Cikarang Industrial Estate

Site Integrity and Master Plan MM2100 Cikarang Industrial Estate

PROJECT DETAIL Stake-out and Leveling Survey Railway Alignment at Muara Wahau and Bengalon (40km) - East Kalimantan

Stake-out and Leveling Survey Railway Alignment at Muara Wahau and Bengalon (40km) - East Kalimantan

PROJECT DETAIL Site Selection and Integrity Assessment for Sanggar Sarana Baja Workshops

Site Selection and Integrity Assessment for Sanggar Sarana Baja Workshops

PROJECT DETAIL RUTR Kota Sendawar

RUTR Kota Sendawar

Close