The Study of Kotopanjang Hydroelectric Power Plant and Associated Transmission Line Project 2001, Riau - Sumatera Barat

During 2002-2009, BITA was commissioned by JBIC to conduct field survey and study in order to inspect the current condition of the project, and JBIC identified the several issues to be addressed. Considering the above context, JBIC proposes extending the field survey for the purposes of assisting PLN to prepare the project completion report and other supplemental informations for JBIC Jakarta Representative Office.