• Share :

Pre-Feasibility Study of Oxbow Cut-Off Channel in Near Estuary of The Satui River, South Kalimantan

PT. Arutmin Indonesia plan to construct cut off channel from coal loading facility to down stream of Satui River. The cut off channel is planned to incrase the accessability of barge to the loading facilities in Satui River down stream.

Scope of works covers to provide any input rearding to the environmental and social aspects in term of their application to have its construction permit from local authority.

Close