Engineering Work for Sengkang Power Expansion Project

The Sengkang Power Plant (1 x 60 MW) is currently under development, where Truba Jurong Engineering (TJE) is providing EPC services. BITA was assigned to prepare M&E and Civil/Structure design documentation to be constructed by TJE. The design documentation based on the basic provided by the major equipment vendor.

Following completion this project. BITA in assigned to provide the same services directly to the client (World Energy) for the second new Gas Turbine and Steam Turbine.