• Share :

Engineering Design and Construction Management PTBA Bridge (Package G-178A), Tanjung Enim, Muara Enim, South Sumatera

This PTBA Bridge is built to replace the old one and connects Tanjung Enim Town and PTBA area, following the overall scheme of development for PT. Bukit Asam (PTBA).  This 60m span bridge was designed to use pre-stressed concrete structure with bored pile foundation. BITA's scope of services as the consultant is preparing preliminary design, structural design, technical specification, bill of quantity and cost estimate for the construction.

BITA's scope of services as the constultant is preparing preliminar design, structural design, technical specification, bill of quantity and cost estimate for the construction.

Close