• Share :

Stake Out Survey Proposed Development Project of Coal Transportation Railway Corridor from Muara Wahau to Lubuk Tutung (130 KM)

RMMI plans to develop an approximately 130 KM long railway transport corridor (including siding) from Muara Wahau to Lubuk Tutung, BITA was appointed to conduct a Stake Out Survey, including identifying Land Use and land Ownership Status as part of lan availability and suitability study. The study covers the whole project development areas, including the railways corridor and consists of desk study Field Survey, Observation and Secondary Data Collection, Data Analysis and Reporting
Close